Portfolio

Timiskaming Dam Complex

Ottawa River, Ontario side at Timiskaming 2015-2016The Ontario portion of the Timiskaming Dam Complex, located 65 kilometres northeast of North Bay, Ontario, was more than a 100 old and needed to be replaced....

Goldcorp Inc.

We are contracted by Goldcorp in Northern Ontario to crush materials for a tailings dam. This includes various road material, 1 1/2 clear stone, A gravel, 8˝ minus, 6˝ minus, stemming material, and crush gold orr for the mill (6˝ minus down to 3/8˝)....

Brion Energy

The Sarjeant Company was contracted by Brion Energy to provision and operate a ready mix plant to produce concrete for the construction of a SAGD (Steam-assisted gravity drainage) plant for oil and gas extraction from the oil sands near Fort McMurray, Alberta....

Detour Gold Corporation

Custom Concrete (Northern) Ready Mix Concrete Division provided approximately 120,000 m3 (160,000 yd3 ) of concrete for the construction of the new processing plant, housing and various other buildings on site. The operation utilized 2 concrete plants and 18 trucks producing up to 8,000 m3...

New Gold

Custom Concrete Northern was contracted by New Gold Inc. to supply and commission a concrete batch plant along with cement and admixtures for the production of CIPC used for the construction of the gold mine crushers and mill. This project was done as a Joint...

Edmonton Light Rail Transit

Custom Concrete Northern was contracted by TransEd, a civil joint venture of Ellis Don, Bantrel and Bechtel to supply, commission and operate a central mixing concrete batch plant for the production of shotcrete. The project is a large Light Rail Transit expansion called the Valley...

Custom Aggregate Properties

Custom Concrete is one of the largest aggregate producers in Northern Ontario, producing quality concrete sand and stone for their internal concrete operations. Custom Concrete is also a leading supplier of road material such as A gravel, HL3/HL4/HL8 for asphalt, winter sand for municipal works...

Detour Lake Gold Mine

We were contracted by North America Construction (NAC) and later Detour Gold Corporation to produce all road materials for the expansion of a tailings dam. This project included supply of A gravel, concrete sand and stone, and various aggregate products including 6˝ minus, 3˝ minus,...

Tahoe Resources Inc.

Custom Concrete (Northern) installed a new paste plant at Tahoe Resources Inc. Timmins West Mine Site in 2013. This 24/7 operation runs with a 4.5 cubic meter twin shaft mixer designed to screen sand and tailings from their damn. This project uses a combination of...

McEwen Mining

Custom Concrete (Northern) installed a Hydraulic Fill Plant at the Black Fox Mine Site in 2015. This plant is a dry batch plant which utilizes concrete ready mix trucks to mix and deliver the hydraulic fill. This project often operates 24 hours a day, 7...